Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Five India-backed terrorists killed in Panjgur IBO: ISPR

    August 11, 2026

    Dogs can distinguish between emotions in a human face, shows study

    August 11, 2026

    Ann Hui to receive Busan’s major honour

    August 11, 2026
    Facebook X (Twitter) Instagram
    • Home
    • Politics
    • News
    • Magazines
    Facebook X (Twitter) Instagram
    Login
    22Media22Media
    Subscribe
    • Home
    • News
      • Pakistan News
      • World News
      • Amazing News
      • Only On 22
    • Sports
    • Bussiness
    • Innovation
      • Health & Sciences
      • Technology
    • Culture
      • Crime & Justice
      • Entertainment
    • Politics
    • Magazines
    • Weather
    • Video
    • Live
    22Media22Media
    Home»News»Pakistan News»Karachi faces water shortfall after K-Electric cable fault: KWSC
    Pakistan News

    Karachi faces water shortfall after K-Electric cable fault: KWSC

    22febdm@gmail.comBy 22febdm@gmail.comMay 31, 2026No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    This representational image shows Karachi Water and Sewerage Corporation (KW&SC) employes working at Dhabeji pumping station. — Facebook/@CMSindh/File
    This representational image shows Karachi Water and Sewerage Corporation (KW&SC) employes working at Dhabeji pumping station. — Facebook/@CMSindh/File

    The Karachi Water and Sewerage Corporation (KWSC) on Sunday confirmed that the port city is currently facing a shortfall of 54 million gallons per day (MGD) after electricity supply to North East Karachi Pumping Station was suspended due to a fault in K-Electric’s main cable.

    In a statement, the spokesperson said that the power supply to the NEK pumping station was suddenly suspended at 3:27am today, due to which the activities of K-II Pumping Station were affected and the water supply system to the city was partially affected.

    After being contacted, K-Electric’s technical team reached the spot and assessed the situation, the spokesperson added.

    The official said that KWSC made alternative arrangements on an emergency basis to restore the water supply.

    Backfeed was provided to the K-II pumping station through the K-III feeder, due to which the power supply was partially restored at 5:50am. However, due to limited electrical capacity, pumping operation could not be fully restored,” the spokesperson added.

    If the fault is not rectified immediately and on a permanent basis, there is a possibility of further shortage in water supply, which may have an impact on the water supply schedule in different areas of the city, the official added.

    The spokesperson maintained that the temporary arrangement will continue until KE fully repairs the cable fault and restores normal power supply.

    KWSC urged the KE to repair the fault and restore the power supply on an emergency basis to save the citizens from further disruption in the water supply.

    The official said that the KWSC is continuously monitoring the situation and is utilising all available resources to restore normal water supply across the city. 

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    22febdm@gmail.com
    • Website

    Related Posts

    Five India-backed terrorists killed in Panjgur IBO: ISPR

    August 11, 2026

    Pakistan, US renew Fulbright-HEC partnership to advance higher education

    August 11, 2026

    Cambridge International announces AS, A-level results for June 2026 exams

    August 11, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Demo
    Our Picks
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Don't Miss
    Pakistan News

    Five India-backed terrorists killed in Panjgur IBO: ISPR

    By 22febdm@gmail.comAugust 11, 20260

    Security personnel patrol with vehicles on a street in Quetta, Balochistan. — AFP/FileSecurity forces conduct…

    Dogs can distinguish between emotions in a human face, shows study

    August 11, 2026

    Ann Hui to receive Busan’s major honour

    August 11, 2026

    YouTube to tighten monetization requirements for creators from 2027

    August 11, 2026

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    22Media
    Facebook Instagram YouTube WhatsApp
    • Home
    • Politics
    • News
    • Magazines
    © 2026 22Media. Designed by AleemSoft Hub.

    Type above and press Enter to search. Press Esc to cancel.

    Sign In or Register

    Welcome Back!

    Login to your account below.

    Lost password?